VOLTPROM.pro
Factory → your site, no reseller markup

Energy hardware,
factory direct from China

Hybrid inverters, PV plants, heat pumps, switchgear and compressors. We model the economics before you buy: datasheets, settings, payback. Central Asia & worldwide, engineer-to-engineer support.

Solar and wind energy
3–60 kW
hybrid inverters: Deye, Growatt, Solis
to −25°C
EVI heat pumps, COP up to 4.2
6300 A
CHINT/Delixi gear, cabinets to your SLD
5 years
warranty honored, spares in every crate

What we supply

Six verticals — from a home solar station to a shop-floor compressor room.

🤝 Dealers — pricing, MOQ, training, territory protection Factory pricing for installers and electrical businesses in KZ/CA: demo kits, engineer training, territory protection, co-marketing. →

How we work

1. Brief

Describe the site: power, task, location. A single-line diagram is perfect.

2. Sizing

An engineer models configuration and economics. You get a BOM with datasheets, not a catalog.

3. Contract

50/50 terms, 15–40 day consignments. Passports, certificates and tracking included.

4. Startup

Commissioning support or guided video setup. Warranty and ZIP spares — we stay after the sale.

Why factory-direct

Engineering supply, not a Chinese lottery

Engineer before salesperson

Engineer before salesperson

No price list before we see the load. Every quote ships with a sizing sheet, a comparison against the incumbent brand and a five-year spares plan. If it doesn't pencil, you hear it before the order.

Paperwork that survives a tender

Paperwork that survives a tender

EAC declarations per batch, IEC 62109 / EN 50530 factory reports, serial traceability. Customs is our job — you get a document set your supervision accepts.

Factories we actually walked

Factories we actually walked

20+ plants in the pool; we sell the ones we visited — line, lab, ageing room. Video FAT before crating, consolidation in the Pearl River Delta, reserved rail slots to Almaty.

FAQ

Lead time to Kazakhstan? +

Rail consolidation runs 18–25 days door-to-door to Almaty; stock items ship in 3–5 days. Sea is cheaper for full containers, 35–45 days.

Certification? +

Every batch carries EAC (TR CUS) declarations plus factory IEC test reports. We clear customs and hand you the set.

What happens on failure? +

Warranty parts ride the next scheduled consignment; the ZIP kit (filters, contactors, fans) ships with the machine by default.

Single unit without dealer terms? +

Yes — MOQ is one at list price. Dealer tiers open from a mixed batch of five.

Payment? +

Contract with a KZ entity, 50/50 split, invoices in KZT or USD. Project volumes can be financed against consignment.

Request a quote

WhatsApp / Telegram — fastest — @energetik_kz_bot