Home / Solar power plants
Turnkey PV: homes 5–30 kW, business 50 kW+
Almaty yields ~1,700 kWh per kWp a year; Shymkent even more. A 10 kWp rooftop covers summer A/C and water heating; commercial plants pay back in 4–6 years. We model your exact bill first — numbers before any hardware.
Specifications & lineup
Panelstier-1 TOPCon 550–700 W (Jinko, LONGi, Trina)
InvertersDeye/Solis hybrid, Growatt string
StorageLiFePO4 5–60 kWh
Mountingroof/facade/ground, wind & snow load calculation
Paperworkdesign, grid interconnection, commissioning
Questions on this line
Does winter kill the economics? +
December still yields 35–45% of summer output; with net-metering the case works year-round.
Self-install possible? +
Yes — kit ships with mounting drawings and video support; commercial sites get remote engineer supervision.
Other verticals
Request a quote
WhatsApp / Telegram — fastest — @energetik_kz_bot