Turnkey PV: homes 5–30 kW, business 50 kW+

Almaty yields ~1,700 kWh per kWp a year; Shymkent even more. A 10 kWp rooftop covers summer A/C and water heating; commercial plants pay back in 4–6 years. We model your exact bill first — numbers before any hardware.

Solar power plants

Specifications & lineup

Panelstier-1 TOPCon 550–700 W (Jinko, LONGi, Trina)
InvertersDeye/Solis hybrid, Growatt string
StorageLiFePO4 5–60 kWh
Mountingroof/facade/ground, wind & snow load calculation
Paperworkdesign, grid interconnection, commissioning

Questions on this line

Does winter kill the economics? +

December still yields 35–45% of summer output; with net-metering the case works year-round.

Self-install possible? +

Yes — kit ships with mounting drawings and video support; commercial sites get remote engineer supervision.